TRL 8

After testing and validation of TLR 7 pilot project Limenet will develop first of a kind negative emission project in operational environment with completed system of carbon capture and storage.

Metrics:

  • Maximum production of 223 kg/h of decarbonized calcium hydroxide (this hydroxide will be used to store biogenic CO₂ from other sources)
  • Maximum production of 287 kg/h of negative emissions from biogenic CO₂ 
  • The total of biogenic CO₂ stored will be: 540 kg/h in the form of calcium bicarbonates

The plant will be operational 24/7 and will be used to deliver the negative emissions sold on the voluntary market.

When

2024 Q3/4

Where

Taranto, Italy (Approximate area on Maps)

Partner

Hyrogas for syngas production and local partner for project implementation

Limenet